San Francisco Department of Early Childhood Facilities Upgrade

Design-Build ADA, MEP & Structural Improvements | Whitney Young & Martin Luther King Centers
Bayshore, SF
2022
SF Dept of Early Childhood

Project Overview

Comprehensive design-build renovation of two critical childcare facilities serving San Francisco’s Bayshore neighborhood. This multi-phase project delivered essential accessibility, mechanical, electrical, plumbing, and structural upgrades to the Whitney Young Center and Martin Luther King Center, enhancing safety and functionality for children, families, and staff while maintaining continuous childcare operations.

Scope of Work

Pre-Construction Services

  • Detailed cost estimation for dual-facility improvements
  • Comprehensive scope development and constructability analysis
  • Designer procurement and team selection
  • Value engineering to maximize budget effectiveness
  • Phasing plans to maintain childcare operations

ADA Accessibility Upgrades

  • New compliant access ramps with proper slope ratios
  • Handrail and guardrail installations meeting current code
  • Accessible pathway improvements throughout both facilities
  • Signage and wayfinding enhancements
  • Parking and drop-off area accessibility modifications

Structural Improvements

  • New exterior concrete staircase design and construction
  • Retaining wall engineering and installation
  • Foundation work for structural stability
  • Seismic upgrades meeting San Francisco building codes
  • Concrete flatwork and site grading corrections

MEP System Upgrades

  • Complete sewer line replacement at both facilities
  • Underground utility repairs and modernization
  • Plumbing system improvements for reliability
  • Electrical upgrades supporting facility operations
  • Safety and code compliance enhancements

Site Infrastructure

  • New perimeter fencing for enhanced security and safety
  • Drainage improvements and storm water management
  • Landscape restoration and erosion control
  • Paving repairs and surfacing upgrades
  • Outdoor play area safety enhancements

Project Challenges

Continuous Childcare Operations

  • Both facilities remained fully operational throughout construction
  • Work scheduling around daily childcare programs and activities
  • Child safety protocols and secure construction zones
  • Noise and dust mitigation during program hours
  • Parent drop-off and pick-up access maintained at all times

Multi-Facility Coordination

  • Simultaneous work at Whitney Young Center and Martin Luther King Center
  • Resource allocation across two active job sites
  • Consistent quality standards between facilities
  • Unified design language while addressing site-specific conditions
  • Budget management across dual-location scope

Design-Build Delivery

  • Integrated estimating, design, and construction services
  • Designer coordination and contract management
  • Permitting through San Francisco Department of Building Inspection
  • Value engineering during design development
  • Field adjustments and real-time problem solving

Bayshore Neighborhood Considerations

  • Community-sensitive construction practices
  • Coordination with San Francisco Department of Early Childhood staff
  • Stakeholder communication with families and neighbors
  • Site access in residential neighborhood setting
  • Minimal disruption to surrounding community

Results

  • Two childcare facilities upgraded with full ADA compliance
  • New exterior concrete staircase providing safe, durable access
  • Accessible ramps meeting current accessibility standards
  • Complete sewer line replacement ensuring reliable infrastructure
  • Structural retaining walls providing long-term site stability
  • Enhanced perimeter fencing improving security and safety
  • Zero interruption to critical childcare services throughout construction
  • Improved facilities serving Bayshore neighborhood families
  • Design-build efficiency delivering quality results on schedule and budget